← Study workshops

Law and Business · Contracts

Contract deposits and change orders

Use the standard home improvement deposit limit and identify the documents that record a change in scope.

How to approach it

These examples use ordinary California home improvement contracts with no statutory bond or joint-control exception. Exclude finance charges when comparing ten percent with the $1,000 ceiling.

A smaller kitchen job

An owner signs a $6,400 home improvement contract. With no finance charges, what is the largest ordinary down payment?

Show the reasoning
  1. Ten percent of $6,400 is $640. Compare that figure with $1,000.
  2. The smaller figure controls, so the maximum is $640.

A larger remodeling job

A contractor proposes $2,400 down on a $24,000 home improvement contract. How much would the proposed deposit exceed the ordinary limit?

Show the reasoning
  1. Ten percent is $2,400, but the lower limit is $1,000.
  2. The proposed deposit exceeds that amount by $1,400.

A different countertop

Before installation the owner requests a different countertop that changes the price. What should be completed before the changed work begins?

Show the reasoning
  1. Describe the changed scope and price in a written change order.
  2. Obtain signatures from the owner and contractor beforehand and include the document in the contract record.

Official reading

Browse all workshops →