Law and Business · Contracts
Contract deposits and change orders
Use the standard home improvement deposit limit and identify the documents that record a change in scope.
How to approach it
These examples use ordinary California home improvement contracts with no statutory bond or joint-control exception. Exclude finance charges when comparing ten percent with the $1,000 ceiling.
A smaller kitchen job
An owner signs a $6,400 home improvement contract. With no finance charges, what is the largest ordinary down payment?
Show the reasoning
- Ten percent of $6,400 is $640. Compare that figure with $1,000.
- The smaller figure controls, so the maximum is $640.
A larger remodeling job
A contractor proposes $2,400 down on a $24,000 home improvement contract. How much would the proposed deposit exceed the ordinary limit?
Show the reasoning
- Ten percent is $2,400, but the lower limit is $1,000.
- The proposed deposit exceeds that amount by $1,400.
A different countertop
Before installation the owner requests a different countertop that changes the price. What should be completed before the changed work begins?
Show the reasoning
- Describe the changed scope and price in a written change order.
- Obtain signatures from the owner and contractor beforehand and include the document in the contract record.