Structural plan review sheets

Use each project’s dimensions and notes to decide whether its design calls for a field correction or a question for the designer. All five projects are fictional. Their design limits apply only to the sheet where they appear.

Start 15 plan review questions

Standard drawing applicability sheet

Our fictional standard drawing may be used only where the lot slope is no more than 30 percent and the documented soil bearing capacity is at least 1,800 psf. The west pad rises 8 feet over 20 horizontal feet. The east pad rises 4 feet over 20 horizontal feet. Both pads have a soil report of 1,600 psf. The register calls for a site-specific design when a limit fails. In this example, slope equals rise divided by horizontal run.

Check the slopes

The west pad has a 40 percent slope and the east pad has a 20 percent slope. Check each against the limit, then check soil capacity separately.

Window header and roof connection

Sheet A2 sizes opening W4 between a sill at 3 feet and a window head at 7 feet above the floor. Detail S4 puts the framing header directly over the window head and shows roof clip C at each marked truss-to-wall seat. Wall panel type, edge fastening and field fastening are listed in schedule S8. An open circle at the top of the wall refers to S4; it is not itself a clip designation.

Joist routing review

For this fictional member, the approved drawing says to keep the middle third of the span free of notches. In either outer third a notch may be at most 1 inch deep. A round hole may be up to 2 inches in diameter and must leave at least 2 inches of clear wood to both top and bottom edges. At a framed opening, detail J calls for hanger H at both ends of any tail joist spanning more than 10 feet.

Lateral bracing and hardware

In this original design a roof diaphragm delivers 12 kips to wall lines N and S in equal shares. The vertical brace schedule continues line N through the ceiling space to blocking at the roof deck. At the ends of N, symbol HD marks a hold-down for vertical uplift. Symbol SB along the sill marks bolts for sliding force. Interior finish studs end at the ceiling and carry neither symbol.

Check the load allocation

The drawing assigns equal shares of 12 kips to two walls. Each wall takes 6 kips.

A service crossing at a braced wall

This project's detail P6 permits a single rectangular service opening up to 4 inches long in the designated braced panel. The measured opening includes saw kerfs at both ends. The adjacent top-plate repair calls for strap SP with 8 specified fasteners on each side of the cut. Note R directs unresolved conflicts between structural and service sheets to the designer before cutting. Workshop ratings and fastening counts apply only to this drawing.