Read the framing shop sheets
Follow the direction arrows, placement marks and elevation datums on these four fictional jobs. All dimensions and callouts apply to the project shown. The CSLB General Building outline includes subfloor framing, roof framing, siding and stairs.
Floor joist and opening plan
| West bay | Joist arrows W → E |
|---|---|
| East bay | Joist arrows N → S |
| Opening OP1 | West bay. North and south edges parallel to the joists. |
| F3 at opening | Paired trimmers at parallel edges. Headers across joists at each end. |
| Dashed chase | Below floor. No opening. |
Sheet F1 shows grid A west of grid B. Joist arrows run west to east in the west bay and north to south in the east bay. Opening OP1 lies entirely within the west bay. Its north and south edges are parallel to those joists. Note F3 assigns paired trimmers to each parallel edge and headers to each end across the joists. A dashed pipe chase beside OP1 is marked below floor, no opening.
Roof truss placement strip
| Line 1 | GE end |
|---|---|
| Lines 2–5 | One T1 per line |
| Line 6 | Two GT girder plies on this line. Connection-face triangle toward street. |
| Lines 7–8 | One T1 per line |
| Line 9 | GE end |
Viewed from the street, the placement drawing counts nine equally spaced truss lines from left to right. Lines 1 and 9 each receive a GE end truss. Line 6 receives a pair of GT girder plies at the same line. Every other line gets one T1 truss. At line 6 a triangle marks the face that receives the porch trusses, pointing toward the street. A packaging label lists only piece types and totals.
Cladding transition elevation
| LO · up to 4 ft | P panel |
|---|---|
| MID · 4 to 10 ft | L lap siding |
| HI · above 10 ft | P panel |
| F flashing | Upper edge of each lap-siding band |
| West return | P full height. Omit band flashing. |
Elevation E4 uses horizontal band lines measured above the same datum. The top of band LO is at 4 feet. Band MID runs from 4 feet to 10 feet and band HI is above it. Panels are tagged P on LO and HI, lap siding L on MID. Flashing F is marked only at the upper edge of each band that carries lap siding. The west return carries a separate note: use panel P for its full height and omit the band flashing there.
Stair section and framing elevations
| Lower finished floor | 100 ft 2 in |
|---|---|
| Finished landing | 103 ft 2 in |
| Upper finished floor | 106 ft 8 in |
| Riser count | 6 lower, 7 upper. Equal heights within each flight. |
| Landing finish | 2 in above rough framed deck |
Section S7 gives a lower finished floor at elevation 100 feet 2 inches, a landing at 103 feet 2 inches and an upper finished floor at 106 feet 8 inches. The drawing calls for six equal risers in the lower flight and seven in the upper. The landing has a 2-inch finish build-up above its rough framed deck. All elevations refer to the same datum. Use these project dimensions to read the drawing.
Check the stair elevations
103 feet 2 inches minus 2 inches is 103 feet 0 inches. The upper flight rises 42 inches from landing to upper floor. Divide that rise by its seven risers.